Available Photo Galleries
About This Job
- Rockledge UPS
This project was completed under a FDEP Contract for the removal of 4000 tons of petroleum contaminated soil, dewatering, and new double wall UST system including the dispensers. The Dewatering system was NPDES Permitted for discharge to surface water and sewer. The soils were excavated and direct loaded into tractor trailers because of constraints on space and leaving the facility at full delivery capacity. The area was backfilled and compacted with coquina rock and DOT Limestone. The project also included upgrading the fueling system and dispensers. .